Skip to main content

HIRALIY Garden Lawn Grass Greenhouse 92FT Water Dripping Irrigation Kit Watering System

$94.28

  • Free US shipping
  • Arrives

Hiraliy 91.8FT/28M Drip Irrigation Kits 
  • Adjustable Drip Irrigation Emitter - The drip emitter can be adjusted to stop, to micro drip, to spray, so you can use it to water many kinds of plants in your garden, and can save up to 50% in water savings. What's more, the drip emitters have the support stake, convenient for placing in soil.
  • No-leaking Two-ways Adapter - The drip irrigation system kit provides the exclusive two-ways adapter, which has a solid construction. It can not only separate two drip lines but also be adjusted by the ON/OFF switch. US standard 3/4" threaded size, widely matching for the garden connector, such as outdoor faucet, hose splitter, garden filter, garden timer.
  • Easy To Assemble & Use - Simple installation without digging or plumbing skills, simply insert the fittings and droppers, you can begin watering your plants instantly. The watering system kit includes the User Manual.
  • Wide Applications - Irrigation system kit is great for the lawn, the patio vegetable garden, plant greenhouse, flower bed, the raised bed, fruit orchards, and shrubs.
  • The Whole Kit to Make The Drip System - This drip irrigation kit includes all accessories to make a drip irrigation system. 91.8FT(28m) black tubing, 2pcs two-ways brass adapters, 22pcs Tee-connectors, 22pcs drip emitters 4pcs, ON/OFF switch.

Drip Watering System, Saving Water, Saving Time

Using the drip irrigation kit, you just need to turn on the faucet/hose switch. Then the irrigation system will water the plant automatically in your raised bed, your veggie garden, your greenhouse at the same time, and so on.

It will save about 50% water and save much of your time.

Adjustable Spray To Meet Different Plants, No Waste Of Water

The drip emitter can be adjusted to stop, to micro drip, to spray, so you can adjust spray according to different plant's water needs, and avoid waste for excessive water, or drying up for too little water.

What's more, the drip emitters have the support stake, convenient for placing in soil.

Easy To Assemble & Use

Simple installation without digging or plumbing skills, simply insert the fittings and droppers, you can begin watering your plants instantly. The watering kit includes the User Manual with the QR code to get the installation video.

Hose Spigot

It can be connected to garden hose, convenient for the extending of the drip system.

Garden Timer

It can be connected to garden timer to make automatic drip irrigation system.

Splitter

It can be connected to splitter to install two systems.

Filter

It can be connected to filter to prevent hard water.


Isin:
IYLO8XUDFHVI

$94.28

  • Free US shipping
  • Arrives

In Stock

, Fulfilled by IBSPOT • Ships from US

IBSPOT Buyer Protection
  • Free 30-Day Returns
  • Full Refund for Damaged or Incorrect Items
  • Guaranteed Delivery or Money Back
  • Secure Checkout & Fast Support
scroll to top arrow
HIRALIY Garden Lawn Grass Greenhouse 92FT Water Dripping Irrigation Kit Watering System

HIRALIY Garden Lawn Grass Greenhouse 92FT Water Dripping Irrigation Kit Water...

$94.28

Hiraliy 91.8FT/28M Drip Irrigation Kits 
  • Adjustable Drip Irrigation Emitter - The drip emitter can be adjusted to stop, to micro drip, to spray, so you can use it to water many kinds of plants in your garden, and can save up to 50% in water savings. What's more, the drip emitters have the support stake, convenient for placing in soil.
  • No-leaking Two-ways Adapter - The drip irrigation system kit provides the exclusive two-ways adapter, which has a solid construction. It can not only separate two drip lines but also be adjusted by the ON/OFF switch. US standard 3/4" threaded size, widely matching for the garden connector, such as outdoor faucet, hose splitter, garden filter, garden timer.
  • Easy To Assemble & Use - Simple installation without digging or plumbing skills, simply insert the fittings and droppers, you can begin watering your plants instantly. The watering system kit includes the User Manual.
  • Wide Applications - Irrigation system kit is great for the lawn, the patio vegetable garden, plant greenhouse, flower bed, the raised bed, fruit orchards, and shrubs.
  • The Whole Kit to Make The Drip System - This drip irrigation kit includes all accessories to make a drip irrigation system. 91.8FT(28m) black tubing, 2pcs two-ways brass adapters, 22pcs Tee-connectors, 22pcs drip emitters 4pcs, ON/OFF switch.

Drip Watering System, Saving Water, Saving Time

Using the drip irrigation kit, you just need to turn on the faucet/hose switch. Then the irrigation system will water the plant automatically in your raised bed, your veggie garden, your greenhouse at the same time, and so on.

It will save about 50% water and save much of your time.

Adjustable Spray To Meet Different Plants, No Waste Of Water

The drip emitter can be adjusted to stop, to micro drip, to spray, so you can adjust spray according to different plant's water needs, and avoid waste for excessive water, or drying up for too little water.

What's more, the drip emitters have the support stake, convenient for placing in soil.

Easy To Assemble & Use

Simple installation without digging or plumbing skills, simply insert the fittings and droppers, you can begin watering your plants instantly. The watering kit includes the User Manual with the QR code to get the installation video.

Hose Spigot

It can be connected to garden hose, convenient for the extending of the drip system.

Garden Timer

It can be connected to garden timer to make automatic drip irrigation system.

Splitter

It can be connected to splitter to install two systems.

Filter

It can be connected to filter to prevent hard water.


Isin:
IYLO8XUDFHVI

Hiraliy 91.8FT/28M Drip Irrigation Kits 
  • Adjustable Drip Irrigation Emitter - The drip emitter can be adjusted to stop, to micro drip, to spray, so you can use it to water many kinds of plants in your garden, and can save up to 50% in water savings. What's more, the drip emitters have the support stake, convenient for placing in soil.
  • No-leaking Two-ways Adapter - The drip irrigation system kit provides the exclusive two-ways adapter, which has a solid construction. It can not only separate two drip lines but also be adjusted by the ON/OFF switch. US standard 3/4" threaded size, widely matching for the garden connector, such as outdoor faucet, hose splitter, garden filter, garden timer.
  • Easy To Assemble & Use - Simple installation without digging or plumbing skills, simply insert the fittings and droppers, you can begin watering your plants instantly. The watering system kit includes the User Manual.
  • Wide Applications - Irrigation system kit is great for the lawn, the patio vegetable garden, plant greenhouse, flower bed, the raised bed, fruit orchards, and shrubs.
  • The Whole Kit to Make The Drip System - This drip irrigation kit includes all accessories to make a drip irrigation system. 91.8FT(28m) black tubing, 2pcs two-ways brass adapters, 22pcs Tee-connectors, 22pcs drip emitters 4pcs, ON/OFF switch.
irrigation system

Drip Watering System, Saving Water, Saving Time

Using the drip irrigation kit, you just need to turn on the faucet/hose switch. Then the irrigation system will water the plant automatically in your raised bed, your veggie garden, your greenhouse at the same time, and so on.

It will save about 50% water and save much of your time.

patio drip watering system

Adjustable Spray To Meet Different Plants, No Waste Of Water

The drip emitter can be adjusted to stop, to micro drip, to spray, so you can adjust spray according to different plant's water needs, and avoid waste for excessive water, or drying up for too little water.

What's more, the drip emitters have the support stake, convenient for placing in soil.

Easy To Assemble & Use

Simple installation without digging or plumbing skills, simply insert the fittings and droppers, you can begin watering your plants instantly. The watering kit includes the User Manual with the QR code to get the installation video.

Hose Spigot

It can be connected to garden hose, convenient for the extending of the drip system.

Garden Timer

It can be connected to garden timer to make automatic drip irrigation system.

Splitter

It can be connected to splitter to install two systems.

Filter

It can be connected to filter to prevent hard water.



Item Specifics

  • Condition: New: A brand-new, unused, unopened, undamaged item in its original packaging (where packaging is ...
  • Number of Emitters: 14
  • Maximum Working Pressure: 35 psi
  • Custom Bundle: No
  • Color: Black
  • MPN: HR-DG28
  • Material: Brass, Plastic
  • Set Includes: Dropper, Connecting Pipe, Connection Set, Connector, Control Valve, Drip Emitter, Drip Head (Endline), Drip Tubing
  • Suitable For: Lawn Irrigation, Planted Areas, Planted Rows
  • Installation Area: Garden (above ground & underground)
  • Tubing Length: 91.8 ft
  • Brand: HIRALIY
  • Type: Irrigation Kit
  • Model: HR-DG28
  • Features: Adjustable Flow Rate, Quick & Easy Connection Technology, Self-Cleaning
  • Product Line: Gardena Micro-Drip
  • UPC: 191762542645
  • Processing Time

    • We process and ship orders Monday through Friday, excluding holidays.
    • Most orders are processed within 1–3 business days, depending on product availability.
    • Processing time does not include delivery time, which varies based on your location and the product’s shipping origin.

    Shipping Coverage

    We currently ship to addresses within the United States only.

    Products may ship from:

    • Our U.S. warehouses, or
    • Our international fulfillment centers (including Korea, Japan, China, Australia, Mexico, Canada, the United Kingdom, and the EU).

    Each product page clearly displays the “Ships From” location before checkout.


    Shipping Methods & Estimated Delivery

    Shipping Method Estimated Delivery Cost
    Free Shipping (US) 5–10 business days Free, available on eligible items
    Standard Shipping (US to US by Item) 5–10 business days $5.95 for the first item, $3.00 each additional
    Standard Shipping (From US Warehouse by Weight) 3–7 business days Starts at $5.95, increasing by $2 for every additional 4 oz (0.25 lb) up to 1 lb, then by $4 for each additional pound beyond 1 lb.
    Extended Delivery (Ships from Overseas Warehouse) 10–20 business days $14.99 for the first item, $2.00 each additional

    Shipping costs vary by product weight, quantity and origin. Exact rates and delivery estimates are displayed on each product page and confirmed during checkout.

    Free Shipping

    We offer free standard shipping on select products or during promotional periods. Availability of free shipping will be displayed on the product page and at checkout. 


    Carriers

    We primarily use USPS and UPS for U.S. deliveries. Items shipped from international warehouses may be handled by partner carriers depending on the country of origin.


    Import Duties & Taxes

    All import duties and taxes for goods imported into the United States are included in the product price. There are no hidden fees or additional charges at checkout.


    Tracking & Notifications

    Every order is fully trackable. You will receive a tracking number via email once your order ships. If your order ships in multiple packages, each package will have its own tracking number. If you don’t receive a shipping confirmation immediately, your order is still being processed and will arrive within the estimated timeframe shown at checkout.

    You can track your shipment anytime using the Track Your Order page on our website.


    Order Changes & Cancellations

    If you need to modify or cancel an order, please contact our customer support team as soon as possible. Orders can only be canceled before they ship. Once shipped, cancellations are not possible, but you may request a return after the item is delivered.

    Contact: support@ibspot.com


    Item Not Received

    If your tracking number shows “Delivered” but you haven’t received your package:

    1. Check with your local USPS or UPS office.
    2. Confirm that the shipping address provided was correct.
    3. If the issue remains unresolved, contact support@ibspot.com for assistance.

    Damaged or Lost Parcels

    If your package arrives damaged or fails to arrive, please contact us immediately. For deliveries to P.O. boxes, ibspot is not responsible for damage caused by weather, temperature, or theft.


    Customer Support

    For any questions about shipping, tracking, or delivery, our customer support team is here to help.

    Email: support@ibspot.com

    We’re always happy to help.

    Please read our policy carefully before making a purchase.
    We aim to ensure every customer has a smooth and transparent experience with ibspot.com.


    Order Cancellation Policy

    Customers may request to cancel an order before it has been shipped.
    Once the package has been shipped, cancellations are no longer possible; however, you may still request a return after receiving your order.

    How to Request a Cancellation

    You can contact us through:

    Please submit your cancellation request as soon as possible after placing the order to allow us to process it before shipment.


    Return Policy

    We accept returns for most items within 30 days of delivery for a full refund.

    To be eligible for a return:

    • The item must be unused, in the same condition as received, and in its original packaging.
    • A tracking number must be provided to confirm the return shipment.

    Non-Returnable Items

    Certain products cannot be returned, including:

    • Perishable goods (for example, food, flowers, newspapers, magazines)
    • Intimate or sanitary goods
    • Hazardous materials or flammable liquids/gases
    • Gift cards
    • Downloadable software
    • Some health and personal care items

    Partial Refunds (If Applicable)

    Partial refunds may be granted in specific situations, such as:

    • Books with obvious signs of use
    • Opened CDs, DVDs, software, or vinyl records
    • Items not in their original condition, damaged, or missing parts not due to our error
    • Items returned more than 30 days after delivery

    How to Return an Item

    To initiate a return, please contact us at support@ibspot.com with your order number and details about the product you wish to return.
    Our team will provide you with return instructions and a prepaid return label.


    Shipping Cost for Returns

    Please contact us before returning any item.

    We may provide a return shipping label for your return. If the return is due to our error, such as receiving the wrong item, a damaged item, or a defective product, we will cover the return shipping cost.

    If the return is due to the customer’s reason, such as ordering the wrong item, changing your mind, or no longer needing the item, the original shipping fee and the return label fee will be deducted from your refund amount.

    If a return is sent back without prior contact or without using our provided label, we cannot be held responsible for any return shipping costs or delivery issues.

    For items valued over $75, we recommend using a trackable shipping service or purchasing shipping insurance.
    We cannot guarantee that we will receive your returned item if shipped independently.


    Refund Processing

    Once your return is received and inspected:

    • In-store returns are refunded to the original form of payment or issued as a gift card.
    • Mail-in returns using our prepaid label are refunded to the original payment method within 3–5 business days after we receive your return.

    Please allow:

    • 5–7 business days for the return to reach our Returns Center.
    • An additional 3–10 business days for your bank to post the refund to your account.

    Damages, Issues & Claims

    Please inspect your order immediately upon receipt.
    If you receive a defective, damaged, or incorrect item, contact us right away at support@ibspot.com.
    We’ll evaluate the issue promptly and make it right.

    Product Claims

    Before purchasing, please review product details carefully.
    If there is a problem with your order upon arrival, visit our Support Center or contact us directly to arrange return shipping or replacement.


    Exchanges

    We do not process direct exchanges.
    The fastest way to get what you need is to return the original item and place a new order once your return is accepted.


    Return Address

    IBSPOT Return Center
    15 Sawmill Ln
    Dover Plains, NY 12522
    United States


    Customer Support

    Our support team is available 24/7 to assist with cancellations, returns, or general inquiries.

    Email: support@ibspot.com
    Contact Form: Contact Us page

    Oops!

    Sorry, it looks like some products are not available in selected quantity.

    OK

    Subscribe To Our Newsletter